7th Grade Math

Pizzas for Parent Night (REACH BOY)

Posted: October 16, 2017

Today was the last day that the students may have had time to work on their 'Number Line/Timeline' Project. The project is due this Friday, 10.20.17

Today in class, the student took their REACH BOY Assessment: Pizzas for Parent Night.  The students were to determine the cost of the pizzas, so they could assess their understanding of rates/proportions, percentages, coordinates, and constant of proportionality.  If the student finished early, they were to use the additional time to work on their 'Number Line/Timeline' Project.

Timeline Project

Posted: October 6, 2017

The project is due Friday, October 20th. Students will not have time in class to work on the project, unless they finish in-class assignments early.

Today in class the students received their rubric and we discussed the expectations for each category.  I gave verbal examples, as well as, showed the students an exemplar of the start of a 'Timeline' project.  The project is due Friday, October 20th.  The students have full creative control, meaning, they can do it on copy paper, construction paper, a poster, or electronically.  If the students do it electronically, they should share it with me, bjbenkovich@cps.edu, on google drive.  Attached is the example.

Attachments & Links

Fall NWEA Testing

Posted: September 25, 2017

Today and tomorrow, September 25th and 26th, the students will be taking the Fall Math NWEA Test.  The students will be taking the test during the time they would normally be having math class.

Return to Classroom 212 homepage